Overview | Commercial | SJVN Limited

Projects Overview


SJVN Ltd. a joint venture between Govt. of India and Govt. of Himachal Pradesh is operating and maintaining hydro power stations viz. Nathpa Jhakri Hydro Power Station (NJHPS) of 1500 MW (6X250 MW) and Rampur Hydro Power Station (RHPS) of 412 MW in the state of Himachal Pradesh. The RHPS is a tail race extension of NJHPS and is operating in tandem with generation flow of NJHPS. The units of NJHPS & RHPS were synchronized one by one and the projects were declared under COD on 18.05.2004 & 16.12.2014 respectively. NJHPS and RHPS are designed to generate 6612 MU & 1878.08 MU of Annual Electrical Energy respectively, in a 90% dependable year with 95% machine availability. Besides, the projects are designed to provide peaking power to the Northern Grid.

The Power generated from their project is being supplied to the various Bulk Power Customer / Beneficiaries / Utilities in Northern Region as per the Power Purchase Agreement (PPA) and allocation order issued by Ministry of Power, GOI. Out of the total energy generated from NJHPS, 12% is supplied free of cost to the home state i.e. Himachal Pradesh. From the remaining 88%, 25% energy is supplied to GoHP at bus-bar rate as an equity power and balance power was allocated to different states / UTs of Northern Region by the Ministry of Power, Government of India. Similarly, energy generated from Rampur HPS, 13% is supplied free of cost to the home state i.e. Himachal Pradesh. From the remaining 87%, 30% energy is supplied to GoHP at bus-bar rate as an equity power and balance power was allocated to different states / UTs of Northern Region by the Ministry of Power, Government of India

Allocation of Power:

Name of Projects Nathpa Jhakri Hydro Power Station (NJHPS Rampur Hydro Power Station (RHPS)
Sr. No. State

Allocation (MW)

Percentage to the installed capacity (%)

Allocation (MW)

Percentage to the installed capacity (%)

1. Haryana 64 4.27 17.11 4.15
2. Himachal Pradesh 547 36.47 172.66 41.91
3. Jammu & Kashmir 105 7.00 29.35 7.12
4. Punjab 152 10.13 23.16 5.62
5. Rajasthan 112 7.47 31.81 7.72
6. Uttar Pradesh 221 14.73 56.68 13.76
7. Uttaranchal 00 0.00 43.59 10.58
8. Chandigarh 08 0.53 - -
9. Delhi 142 9.47 - -
10. Unallocated quota 149 9.93 37.64 9.14
Total

1500

100

412

100

Power Purchase Agreements (PPAs):
Power Purchase Agreements (PPAs) have been signed with all the beneficiaries of the respective projects as per following details:

Sr. No. Beneficiary State Duration of PPA (years)
Nathpa Jhakri HPS Rampur HPS
1. HPPC Haryana 35 35
2. GoHP Himachal Pradesh 35 35
3. HPSEB 40 35
4. PDD Jammu & Kashmir 5* 35
5. PSPCL Punjab 35 35
6. AVVNL, JVVNL & Jd VVNL Rajasthan 35 35
7. UPPCL Uttar Pradesh 35 35
8. UPCL Uttranchal 35 35
9. UT- Chandigarh Chandigarh 35 35**
10. TPDDL, BRPL & BYPL Delhi 35 Not Allocated

* PDD, J&K signed the PPA for NJHPS for the period of 5 years and renewing it after every five years.
**’ For unallocated Quota.

Tariff:

Tariff for NJHPS & RHPS is determined by CERC based on the Tariff Regulations and its amendment issued from time to time. The sale of power from the generating stations is billed to the Bulk Power Customer / Beneficiaries / Utilities as per the Regional Energy Accounts (REA) issued by Northern Regional Power Committee based on instructions / allocation given by MOP, GOI from time to time.

Operational Performance:

The year wise operational performance of Nathpa Jhakri HPS (NJHPS) & Rampur HPS (RHPS) is as follows:

Sr. No. Financial Year Gross Energy Generation ( MU) Capacity Index/ PAF (%)
NJHPS RHPS NJHPS RHPS
1. 2005-06 4104.422 - 69.189 -
2. 2006-07 6014.481 - 92.366 -
3. 2007-08 6448.977 - 96.671 -
4. 2008-09 6608.691 - 96.083 -
5. 2009-10 7018.810 - 98.552 -
6. 2010-11 7140.205 - 98.318 -
7. 2011-12 7610.257 - 104.262 -
8. 2012-13 6777.777 - 105.150 -
9. 2013-14 7192.553 - 105.750 -
10. 2014-15 6838.125 1257.469 105.504 95.967
11. 2015-16 7313.784 1983.398 104.679 99.592