DETAILS OF CONSULTANCY ASSIGNMENTS /OFFERS COMPLETED (UPTO Dec, 2007)

Name of Agency seeking consultancy from SJVNL CEA, MOP
Scope of work Preparation of Pre-feasibility Reports (PFR) for Khab-I & Khab-II HEP on river Satluj basin.
Date of request for consultancy May, 2003
Cost of consultancy Assignment Rs. 28.77 lac
Date of completion March/April 2004
Remarks PFRs of these projects were prepared as per guidelines issued by CEA/CWC. Estimates for the above projects were made on the basis of "CEA Guidelines for preparation of Cost Estimates of PFR of Hydroelectric Projects".
Name of Agency seeking consultancy from SJVNL M/s Bobba Power Projects (P) Ltd. Banglore.
Scope of work To examine techno-economic viability of Hydel scheme namely; Mulibetu (10.5MW)- located in Karnatka.
Date of request for consultancy Oct, 2003
Date of completion Dec, 2003 Lac
Cost of consultancy Assignment Rs. 0.38 Lac
Remarks The consultancy job includes review of DPRs with regard to hydrology, power generation, layout of projects, design of components, cost estimates etc. This consultancy assignment was completed in by experts of SJVNL in 2 months.
Name of Agency seeking consultancy from SJVNL Konkan Railway Corporation Ltd., Mumbai (KRCL)

KRCL is engaged in construction of 90 Km section of single broad gauge railway line between Katra-Laole-Udhampur-Srinagar-Baramula rail link project in J&K.
Scope of work
  • To impart training and know-how in preparation and supply of construction drawings of approach cuttings and portals of tunnels in different kinds of strata.
  • To impart training and know-how in preparation and supply of construction drawings for excavation and support system including but not limited to design of steel ribs after load calculations, rock bolts, shotcreting with or without wiremesh/steel fibres, fabrication drawings of steel ribs for tunnels in different type of strata.
  • To assist KRCL engineers in study of slope stability of deep cuttings, its analysis and design and support requirements wherever required.
  • To assist KRCL engineers in designing and making/supply drawings for water channelizing in and outside the tunnel, consolidation grouting or any special methods required for rock/soil stabilization, tunneling.
Date of request for consultancy Nov., 2003
Date of completion March, 2006
Cost of consultancy Assignment RS. 47.13 Lac
Remarks The assignment was successfully completed in March, 2006 to the satisfaction of KRCL.