Sach Khas HEP with a proposed capacity of 267 MW located on river Chenab in Himachal Pradesh was allotted on 05.01.2021 by GoHP.
After investigation, the capacity of the project has been revised to 287 MW with the generation of 1012 MU in a 90% dependable year against the allotted capacity of 267 MW.
