image

Reoli Dugli HEP

Reoli Dugli HEP with a proposed capacity of 430 MW is located on river Chenab in Distt. Lahaul-Spiti of Himachal Pradesh was allotted on 23.10.2019 by GoHP. MoU signed with GoHP on 06.11.2019. Capacity of the project was revised to 456 MW with the generation of 1597 MU in a 90% dependable year against the allotted capacity of 430 MW.